Our Work

Our Work

Examples of common plumbing repair situations and what a clean finished repair can look like.

Filters

Browse by Type of Work

Portfolio

Repair Comparisons

Each example shows a common issue and a cleaner finished result.

Leak Repair

Under-sink leak repair

Clean under-sink plumbing connection after repair by Al-Jamal LLC
After

New PVC trap and tight connections.

Under-sink plumbing leak area before repair by Al-Jamal LLC
Before

Corroded pipes causing a slow leak.

Leak Repair

Pipe connection repair

Clean pipe connection after repair by Al-Jamal LLC
After

Replaced with modern PVC and secured.

Pipe connection before repair by Al-Jamal LLC
Before

Old cast iron pipe joint failing.

Drain & Sewer

Sink drain repair

Clean sink drain repair after plumbing work by Al-Jamal LLC
After

Drain line fully cleared.

Sink drain area before repair by Al-Jamal LLC
Before

Severely clogged sink drain.

Drain & Sewer

Drain line connection

Clean drain line connection after repair by Al-Jamal LLC
After

Re-piped with the correct slope.

Drain line connection before repair by Al-Jamal LLC
Before

Improperly sloped drain line.

Fixtures

Faucet installation

New faucet installed cleanly by Al-Jamal LLC
After

New faucet installed cleanly.

Faucet area before fixture installation by Al-Jamal LLC
Before

Old, dripping faucet.

Fixtures

Toilet connection repair

Clean toilet connection after repair by Al-Jamal LLC
After

New shutoff valve and supply line.

Toilet connection before repair by Al-Jamal LLC
Before

Leaking supply line valve.

Fixtures

Water heater connection

Clean water heater connection after plumbing work by Al-Jamal LLC
After

New copper connections installed.

Water heater connection before plumbing work by Al-Jamal LLC
Before

Corroded water heater connections.

Bathroom Work

Vanity plumbing

Clean vanity plumbing after finish work by Al-Jamal LLC
After

Organized plumbing hidden inside vanity.

Vanity plumbing before finish work by Al-Jamal LLC
Before

Messy, outdated plumbing layout.

Bathroom Work

Shower fixture installation

Shower fixture installed cleanly by Al-Jamal LLC
After

Finished shower valve and trim.

Shower fixture area before installation by Al-Jamal LLC
Before

Rough-in plumbing exposed.

Bathroom Work

Finished bathroom plumbing

Finished bathroom plumbing after clean fixture installation by Al-Jamal LLC
After

Fully completed bathroom.

Bathroom plumbing before finish work by Al-Jamal LLC
Before

Bathroom stripped to the studs.

Need plumbing help?

Send a short message with the issue, location, and best way to reach you.